Obras lineales

Linear Works

Safety and Health Technical Assistance
Necessary actions are realised to correct the incidents occurred in the area close to the access embankment to the north abutment of the viaduct of Rules dam and the repair of the landslides in the KP 173 + 000 and 168 + 500. Reinforcement works of lattice board through the welding of metallic parts with the purpose of stiffening the support on the new built abutment.
  • Developer: Ministry of Public Works and Transport
  • Construction Budget: € 16,215,468.83
  • Scope of Work: Safety and Health Technical Assistance
Since 2008 Atecsur Engineering has been awarded advisory functions with regard to the necessary measures aimed at enforcing the existing regulations on Labor Risk Prevention in the works developed by the Ministry of Public Works and Transport in the maintenance and operation of roads.
  • Developer: Ministry of Public Works and Transport
  • Scope of Work: Safety and Health Technical Assistance
Stabilization works of Alfamar slope on both sides of the N-340 through a piled wall.
  • Developer: Ministry of Public Works and Transport
  • Scope of Work: Safety and Health Technical Assistance
Protection of slopes to provide stability, reduce degradation, protect against falling rocks, stones and land in order to get the functionality of the planned works.
  • Developer: Ministry of Public Works and Transport
  • Scope of Work: Safety and Health Technical Assistance
Since 2010 we have been realising the safety and health technical assistance for the works promoted by the Regional Government of Andalusia.
  • Developer: Road Directorate of the Regional Government of Andalusia.
  • Scope of Work: Safety and Health Technical Assistance. Coordination of Health and Safety.

Due to the rock falls and possible overturning on bottom drainage valves booths, a stabilization of the existing slope is needed in Canales reservoir. Before the start of drilling, shotcreting with dramix is realised on the affected area to avoid possible material falls on workers. Later, steel bar gewi type passive anchors with a diameter of 50 mm are implemented in a 3x3 meters grid executed perpendicularly to the fracture planes so as to support these blocks. The anchors will realise a virtually cutting work.

  • Developer: Guadalquivir Water Authority
  • Construction Budget: € 494,061.15
  • Scope of Work: Safety and Health Technical Assistance