Water-Waste Management

Water-Waste Management

Project Design. Construction management. Technical Assistance to Construction Management
Construction of a sewage treatment plant of urban waste water. The sewage system used is based on low-cost maintenance model. It works by a pre-treatment containing fixed bars for thickness and a sandbox followed by a septic tank for decantation/digestion and peak attenuation, with a secondary treatment by constructed wetlands of subsurface flow (HAFSs), combining vertical (HAFSsV) with horizontal (HAFSsH) (hybrid system).)
  • Developer: Provincial Council of Granada
  • Construction Budget: € 131,977.77
  • Scope of Work: Construction Project Design
Construction of breakwater wall in Jaen river downstream of Puente de la Sierra, to protect adjoining plots of possible overflow of the river. Large swivel is used with attached to the bucket for better handling of the breakwater clip.
  • Developer: Public Water Authority Guadalquivir
  • Construction Budget: € 1,200,000
  • Scope of Work: Monitoring and Control of the work.
Adaptation of Río Salado bed, protective breakwater repair margin for slope stabilization under housing estate. The walking-excavator machinery is used due to their greater mobility and settlement.
  • Developer: Guadalquivir Public Water Authority
  • Construction Budget: € 1,200,000
  • Scope of Work: Monitoring and Control of the work.
Construction of a new supply reservoir with a regulation capacity of 250 m3 on reinforced concrete and consistent supply networks in the supply pipes from the general network of Castillejar to the new deposit. Distribution pipes from the new reservoir to the population of Puente Arriba and tank drain pipes.
  • Developer: Diputación Provincial de Granada
  • Construction Budget: € 161,832.39
  • Scope of Work: Construction Project Design
Construction of a prefabricated U-shaped channel of self-compacting concrete in sections of 9 m length, 2.30 m x 1.70 m dimensions, and 0.20 m thickness.
  • Developer: Guadalquivir Public Water Authority
  • Construction Budget: € 1,950,536.58
  • Scope of Work: Monitoring and Control of the work.
The purpose of the work is to analyse the comprehensive feasibility of the land conditioning for Green Way use of the mining railway line from Lucainena de las Torres to Agua Amarga (municipality of Níjar). Using all the line of this disused railway infrastructure, this public property would turn into an axis for domestic tourism, with services and promotion capable of bringing together and channeling this clearly booming type of tourism. A sports, recreational and tourist equipment responding to a growing social demand is created and provides safety and universal access to cycling and walking.
  • Developer: Almería Provincial Council
  • Construction Budget: € 2.245.682,19
  • Scope of Work: Feasibility Study